The lockup stage was completed about two weeks ago, however we were able to go in and out of the house to check the progress.
Went for a vist today to try and get some more pictures, but it was all locked up. This is a good thing anyway as most of the materials for the fit-out stage are now on site. I could see in the family room, all doors, door jambs, large pile of architrave, a few lenghts of splayed quad (no idea where this is used) and some melamime sheeting for the shelves. The flat pack cabinets were still not there - so maybe Monday now.
There were at least two fair sized stacks of left over bricks onsite. I could see that a truck had been in and taken one stack. Which makes me wonder, why didn't they take the lot or was this another theft? I will ask the supervisor next week.
I will be going for a walk-through next week with the supervisor. Hopefully he won't mind me taking some photos, and I would expect to see most of the fit-out done and the cabinets installed based on the info I have from PD.
Didn't see our neighbours today, but their house is progressing to the frame stage now.